logo for chambers-house-build-it.com
Home
NEW HOME$225,000
RIVERFRONT HOME
Home contact
START HERE
BASICBLUEPRINT
LAKE COW LOTS
AFFORDABLE
HOUSE DESIGN
Lot
BUILDING MATERIAL
SURVEYING
MATERIAL
FOOTINGS
concrete floors
CONCRETE
concreteforms
concrete stairs
FRAMING FLOORS
WALL FRAMING
ROOF
STAIRS
MOISTURE BARRIER
INSTALL-WINDOWS
MATH
CEDAR-SIDING
decks
DOORS
house blog
SIDING
INSULATION
WINDOWS
MASONARY
MOULDING
NUMBERS
blue prints
cabinets
SAFETY
SIDING
TOOLS
WOOD FOUNDATIONS
INFLOOR HEATING
duplex
cedar shingles

[?] Subscribe To This Site

XML RSS
Add to Google
Add to My Yahoo!
Add to My MSN
Subscribe with Bloglines

leftimage for chambers-house-build-it.com

INSTALLING WINDOWS 


CON-TEC VENTURES LTD.

INSTALL-WINDOWS TO MOISTURE -BARRIER

THE RAIN SCREEN

 MOISTURE BARRIER AND FLASHING 

metric conversion 25 equals 1"



INSTALL-WINDOWS...RAIN SCREENING...WINDOW-WRAP..there are many methods... this is a popular method that  I follow... check with local inspectors if in doubt
WINDOW WRAPPING
FRAME AND SEAL EDGESwindow wrap

INSTALL-WINDOWS AND RAIN SCREENING

Start by stapling a single strip of moisture barrier 300wide under rough opening
...make sure that it extends past window on each side by 300
WINDOW-WRAP... attach at top only you will be sliding building wrap underneath later to form a shingle effect
WINDOW-WRAP... cut two patches of peal and stick membrane 100 by 100 (4"x4") and stick them so they fold back into the corners of rough opening ...
 as per picture                        

 next wrap peel and stick over moisture barrier
and up inside rough opening and up jambs 100(4") see first picture
SILL WRAPPED WITH MOISTURE BARRIER

PEAL AND STICK

WINDOW-WRAP... now fold moisture barrier  into window and wrap 300 back unto sheathing... hanging over shingle style the below sill strip  
WRAP SIDE OF JAMBS WITH MOISTURE BARRIER


...repeat the same for other side of jamb...  and complete with a single 300 (12") wide piece across window header top piece overlaps side jamb pieces shingle style   


STRAPPING AROUND WINDOWS



Now apply a bead of polyurethane caulk around sides and top of window rough opening

and slide window in...shim under window to level  and allow for under sill drainage.. nail window into place






window inserted
...vinyl windows nail middle of slots on sides don't drive nails home(they like to expand in heat...read manufactures notes they all say something different









from INSTALL-WINDOWS wrap to building wrap


















SLIP IN WINDOW CENTRE LEVEL AND NAIL
FLASH HEADER SEE BELOW FOR END DAMS


I use two layers of thirty minute paper to wrap my houses... this is accomplished with a first horizontal layer starter strip followed by a 2nd layer directly on top.. the following layers overlap each other by 1/2 the sheet width every strip
...make sure the layer below window sill is tucked beneath all window wrap layers again shingle style...  I just lightly staple the paper on... and immediately follow with my treated 10m plywood 38 wide furring straps... these straps I nail vertically every 300 (12 ") (this can vary from 8" to 16")
...I use galvi coated wide head 1 3/4" roofing nails  and tack every couple of feet... note minimum sheathing I use is 1/2 inch thick plywood  any thing less and you should find your studs and only nail into these  



FLASHING END DAM STEP #1

Window and Door Header  flashing
-runs up behind moisture barrier 2" or 50 mm
 -extends past window front at least 1/2" or 10mm
-needs an end dam 1" or 25mm  high
- slope 6 degrees
- a 1/4" or 5mm drip edge
-use bender vice grips
-grasp and tighten at the 1" mark
-bend up 90 degrees
-the outside corner will fold outwards.. use vice grips to fold and squeeze flap tight
-snip and fold back front tab...eliminates a sharp edge
-trim back out side top corner




END DAM STEP#2
END DAM STEP#3
diy window flashing
END DAM STEP#5
END DAM STEP#6
END DAM STEP7
END DAM STEP#8
INTERIOR WINDOW INSTALL